Ian Oldcorn preparing the concrete slab for vinyl laying. Left: grinding the concrete smooth (he had to do more grinding than normal because the original concrete contractors did such a lousy job of smoothing it off with the power float machine). Right: Ian applying concrete seal. This was needed because the concrete wouldn’t be bone dry – a four-inch concrete slab needs to be under cover for about four months to dry out.)